

Steam system with supply unit (CVE)
- CVE & steam boiler: fully piped & drained
- Low space requirement due to compact design
- Cost-effective series production of the CVE, optimally matched to each other

Multiple system up to max. 16,000 kg/h
- Maximum efficiency thanks to cascade connection
- Flexible load distribution
- Expandable steam output through series connection of several steam generators

Mobile steam system in a container
- Completely ready for operation as boiler house installation
- Project-related or permanent installation
- All components pre-installed and wired at the factory
Informational material
